A new building does not simply appear on a map. Before it becomes a house, apartment block, commercial centre or industrial facility, it creates a trail of activity. Planning applications are submitted. Construction permits are issued. Electricity connections are requested. Roads and other services begin responding to the changing demand.

What if those signals could be brought together to understand how a city is developing, even when some of the development is happening outside official records?

That is the question explored by Margaret N. Munywoki and Kaveer Singh in their study, Application of GIS to Monitor Infrastructural Development in Mombasa County, Kenya, published in the South African Journal of Geomatics in 2023.

Their approach offers an interesting lesson in how geospatial thinking can turn seemingly unrelated datasets into intelligence for urban planning.

The Problem with Watching a Growing City

Kenya’s rapid urbanisation has made infrastructure monitoring increasingly important. Yet many counties continue to work with datasets held separately by different institutions. Mombasa is no exception.

The researchers point to an important limitation in Kenya’s Electronic Development Application Management System (e-DAMS): while the system can help manage applications and monitor approved developments, unauthorised developments may remain outside the database. That creates a significant blind spot.

A city authority may know what has been approved, but that does not necessarily mean it knows everything that is actually being built. The study therefore explored whether another source of information could help reveal what is happening on the ground.

The Electricity Connection Clue

The answer came from an unexpected place: electricity applications. The researchers compared three major datasets:

  • Mombasa’s 2015–2035 Urban Development Master Plan
  • Approved construction permits
  • Applications for different types of electricity connections

The thinking was relatively simple but powerful. A new development needs electricity. Different types of developments also tend to require different types of electricity connections. If those patterns consistently correspond with construction activity, electricity applications could potentially act as an indicator, or proxy, for infrastructure development.

In other words, the electricity connection request becomes another spatial signal telling planners that something is changing.

When Different Datasets Tell the Same Story

The analysis found a relationship between the types of electricity applications being made and the types of construction permits being approved across Mombasa’s geographical zones.

Corporate electricity applications, individual applications, group applications, additional-load requests and meter-separation applications could be compared against categories of development such as residential, commercial, mixed-use and modifications to existing developments.

This creates an interesting GIS workflow. Instead of looking at electricity infrastructure, construction permits and urban plans as completely separate datasets, they can be layered together. The result is a more detailed picture of where development is taking place and what type of development is emerging.

And where the datasets do not agree, that mismatch can become useful information too. A discrepancy between an approved construction type and the corresponding electricity application could potentially flag an area that deserves further investigation.

That means GIS is not simply showing planners where development is happening. It can also help them ask whether that development is happening as expected.

“Sometimes, the clues are already there. The challenge is knowing how to connect them.”

A Different Way to Find What the Map Can’t See

This is perhaps the most interesting aspect of the research. Traditional monitoring can be expensive and resource-intensive. Counties cannot physically inspect every developing property at all times. A data-driven GIS approach offers another option.

If electricity connection patterns can act as an early signal of development, authorities could use those signals to identify areas requiring closer inspection rather than attempting to monitor everything equally. The researchers argue that this could provide a cost-effective way of monitoring both authorised and potentially unauthorised developments.

For a rapidly developing coastal county like Mombasa, that distinction matters.

But Data Still Has Its Gaps

The study also highlights an important reality that every geospatial professional knows: a clever model is only as good as the data behind it.

The researchers encountered limitations including incomplete electricity application data and construction permit records that lacked important temporal and geographic information. Without consistent dates and coordinates, establishing stronger statistical relationships between datasets becomes difficult.

This is more than a technical inconvenience. It demonstrates why African cities need stronger spatial data standards and better coordination between institutions. If planning authorities, utilities and other agencies collect information in compatible formats, with reliable location, date and other metadata, the potential for cross-agency spatial intelligence becomes significantly greater.

From Infrastructure Monitoring to Urban Intelligence

The Mombasa study ultimately presents an idea that extends beyond electricity. Cities constantly generate spatial clues.

Electricity connections. Building permits. Water connections. Traffic movements. Property transactions. Satellite imagery. Mobile-phone movement patterns.

Individually, each dataset tells only part of the story. Together, they can begin to reveal how a city is changing.

That is where GIS becomes particularly powerful: not simply as a system for producing maps, but as a framework for connecting evidence from different parts of a city and turning it into something planners can act upon.

Mombasa’s experience offers a glimpse of what that future could look like. The next generation of urban monitoring may not depend on putting a sensor on every building or inspecting every street. Sometimes, the clues are already there. The challenge is knowing how to connect them.

Sources and Acknowledgements

This feature is an original editorial interpretation by Afrospatial Magazine, based on the research published by Munywoki, M. N. and Singh, K. (2023), “Application of GIS to monitor infrastructural development in Mombasa County, Kenya”, South African Journal of Geomatics, 12(2), 145–157, DOI 10.4314/sajg.v12i.2.3. Authors: Margaret N. Munywoki and Kaveer Singh, Geomatics Division, University of Cape Town. The study draws on data including Mombasa County’s Urban Development Master Plan, construction permit information and electricity application data. The original research should be consulted for the full methodology, datasets, statistical analysis and limitations. This article has been independently written and paraphrased by Afrospatial Magazine. It does not reproduce the original research paper and is intended to communicate its key ideas and relevance to a broader geospatial readership.